KIMI Phone:+86 18059884790      中文版
GE
Home > GE
GE S20A-177U-UUUA Turbine Control Module
  • Warehouse: Spot
  • Warranty: 365 days
  • Quality: Original module
  • Condition: New
  • Shipping method: Courier delivery

  • Contact person: LI MING
  • Contact number: +86 18059884790
  • WeChat:18059884790
  • E-mail: plc66@qq.com

Product Description

GE S20A-177U-UUUA Turbine Control Module

Product Description

The GE S20A-177U-UUUA is a high-performance turbine control board used for GE Mark V / Mark VI legacy turbine control systems. It undertakes signal acquisition, conditioning and closed-loop control for gas turbine auxiliary control loops, widely used in power generation gas turbine units. It is a discontinued spare part for GE Speedtronic series, mainly supplied as surplus new old stock or refurbished tested units in the aftermarket.

image.png

Features

  • Part Number: S20A-177U-UUUA
  • Brand: GE, Series: Speedtronic Mark V / Mark VI
  • Function: Analog signal conditioning, feedback sampling and loop control for turbine auxiliary systems
  • Supports standard process signal 4-20mA, 0-10V and thermocouple/RTD conversion
  • Industrial grade wide temperature range, anti-vibration and anti-interference design for turbine cabinet
  • Manufacturer Status: EOL, original factory production stopped
  • Typical gross weight: around 0.45kg, origin: United States

Applications

  • GE heavy-duty gas turbine control cabinet (Mark V / Mark VI)
  • Power plant combined cycle gas turbine units
  • Oil & gas mechanical drive turbine control system maintenance and spare replacement
  • Legacy turbine control system retrofit, troubleshooting and spare inventory

FAQ

Q: Can S20A-177U-UUUA work on Mark VIe system?
A: No, it is designed for older Mark V / Mark VI hardware architecture, not compatible with Mark VIe distributed I/O.

Q: Is there a direct replacement part for this board?
A: GE has no direct drop-in replacement; users usually choose refurbished tested units or carry out whole system upgrade.

Q: What test items are required before delivery?
A: Normally include power-on test, signal channel accuracy test, communication and relay output function verification.


Related recommendations